2095 North Loop Road
Alameda, CA 2095 North Loop Road

While at srmErnst, Laura and Carmen worked with Invesco as their development manager to manage the marketing, leasing and project management for their Loop portfolio. Laura and Carmen managed a spec project at 2095 NLR to help attract R&D/life science/advanced-mfg tenants. The spec program included a power upgrade, office buildout, flexible labs, and provisions for a generator. The building was leased to a battery tech tenant upon project completion.

1933 Peralta Street
Oakland, CA 1933 Peralta Street

In addition to the base building improvements, Carmen and Laura managed the spec build out in 1933 Peralta Street while at srmErnst. The spec improvements included a PG&E power upgrade, office buildout including private offices, conference room, restroom cores and breakroom. The project was leased to Nelumbo, a material science company, after project completion.

4700 San Pablo
Emeryville, CA 4700 San Pablo

While at srmErnst, Laura managed the spec program at 4700 San Pablo. The spec project included extensive façade improvements, a PG&E power upgrade, seismic retrofit, construction of mechanical mezzanine, high-bay interiors reconfiguration for future R&D tenants, and 8,000 sf of spec office buildout on two floors including breakroom, private offices and restroom core.

1440 Harbor Bay Parkway
Alameda, CA 1440 Harbor Bay Parkway

To help re-tenant the building for Invesco, Laura and Carmen are managing the spec buildout in 1440 Harbor Bay Parkway on behalf of srmErnst. The spec program includes a large power upgrade, flexible lab spaces, spec office on two floors including private offices, breakrooms, restroom cores, and conference rooms.

2115 North Loop Road
Alameda, CA 2115 North Loop Road

In their role as development manager for Invesco on behalf of srmErnst, Laura and Carmen are currently managing a spec buildout in 2115 North Loop. The spec program includes an office buildout including private offices, conference rooms, breakrooms, and restroom cores, and a demising wall to separate the spec area from the future tenant expansion space. The project is currently under construction.

1919B Peralta Street
Oakland, CA 1919B Peralta Street

In addition to the base building improvements, Carmen and Laura managed the spec buildout in 1919B Peralta Street while at srmErnst. The spec improvements included a PG&E power upgrade, flexible warehouse/manufacturing space, office buildout including private offices, conference room, restroom cores and breakroom. The project was leased to Orbital, an AI-adjacent technology company, after project completion.

1800 Peralta Street
Oakland, CA 1800 Peralta Street

While at srmErnst, Laura and Carmen managed the spec program at 1800 Peralta Street. The spec project included a PG&E power upgrade, voluntary seismic upgrade, flexible manufacturing/warehouse space, and spec office buildout on two floors including breakroom, private offices, conference rooms, and restroom cores.